Yellow Lab A Blog 5

Green - completed, Blue -Planned, Red - Ongoing

Accomplished this week

Entire Lab

This week each group presented their game prototypes to the lab coach and Dr. Ningxu Cai. Each team also contributed to the poster.

A1

Merged the two levels of the game together. Finished the testing section of the final report. Completed the game.

A2

Completed the majority of the game. Made the testing table for the final report. Completed the bulk of the final report.

A4

Made a list of the tasks for the game. Worked on improving visual appearance of the game. Recorded intermediate testing. Worked on final report.

A5

Almost finished second level of the game. Almost finished design manual. Worked on the final report.

A6

Finished the scoring system. Finished the game. Continued work on the final report.

A7

Worked on design manual. Finished the game except for minor details.

To be Accomplished Next Week

Entire Lab

Integrate the game into one program. We will have the open house where every team’s game is presented.

A1

Complete the final report and design manual.

A2

Complete game. Finish design manual. Continue working on final report. Test completed game for glitches.

A4

Finish final report. Finish design manual. Prepare for presentation.

A5

Finish final report. Finish design manual. Finish game.

A6

Finish final report. Finish poster and design manual.

A7

Finish, present and integrate the game to be presented at the open house.

Optional

McGuire's Monster Performer of the Week

Spencer for his 2 minute engineer on the boot and Andrei for sacrificing his perfect attendance record to attend the open house.



No comments:

Post a Comment